The next National CDM Authority Meeting is on -------- at ------- in Indira Paryavaran Bhavan, Ministry of Environment, Forests and Climate Change, Jor Bagh, Aliganj Road in Jal Wing '-------' Conference Room' in Ground floor, New Delhi -110003
Project Details
Project Id 1343/06/2012
Name of Project Blast Furnace waste gas based captive power generation
Location of the Project (Village / District / State) Dusi/Srikakulam/Andhra Pradesh
Project Description Concast Ferro Inc., a unit of Dankuni Steel Limited (CFI) has a Pig Iron Plant at Dusi village of Srikakulam District in Andhra Pradesh. As a part of the pig iron plant CFI authority has considered a GHG abatement project activity of installation of a 4.5 MW Captive Power Plant (CPP), where from after meeting the auxiliary requirements of the power plant, the power will be supplied for the in house consumption of the Pig iron Plant and company owned cement plant in the same compound. The project activity envisages recovery of the Blast Furnace Gas (BFG) and subsequent utilization of the same for generation of approximately 4.5 MW of power. BFG will be combusted in a Blast Furnace Gas fired Boiler (BFGB) to generate High Pressure (HP) steam, which will be routed to a 4.5 MW Steam Turbo Generator (STG). In absence of the project activity the BFG would have been flared to the atmosphere without recovery and utilization. The power requirement under such circumstances would have been catered to from an off-site coal based power plant (PP). Therefore the said project activity results in reduction of GHG emissions from grid by effective utilization of energy within the pig iron plant.
No. of CERs (upto 2012) 12247.88
No of CER per annum 23153
No of CER upto 2020 191712.27
Host Country Approval Status Approved
Project Proponent Concast Ferro Inc., a unit of Dankuni Steels Ltd.
Baseline Methodology AMS-III.Q version - 04 Sectoral Scope 04 Type III: Other Project Activities Category III.Q: Waste Energy Recovery (Gas/Heat/Pressure) Projects. EB 60 Waste Energy Recovery (Gas/Heat/Pressure) Projects
Project Start date (dd/mm/yyyy) 21/03/2007
Project completion date (dd/mm/yyyy) 26/09/2011